Scope review
Review the structure, work boundaries, intended waterproofing system and project requirements.
Civil & infrastructure
Coordinate the waterproofing scope with the structure, site sequence and project interfaces, from initial review to agreed close-out.
Infrastructure requirements vary by structure and exposure. Share the project drawings, intended system and site constraints so the installation scope and suitable capability can be assessed.

Review the structure, work boundaries, intended waterproofing system and project requirements.
Clarify work-front access, preparation, protection and interfaces with other contractors.
Identify joints, transitions, terminations and other critical interfaces.
Agree hold points, test methods, records and the handover package.
Project location; drawings and specification; quantities; preferred membrane or treatment system; access, safety and execution schedule.
Scope, material requirements, preparation, testing, protection, access and any warranty are agreed in the written proposal.