Site readiness
Review subgrade preparation, access, protection layers and deployment conditions.
Containment & lining
For containment work, the prepared subgrade, liner layout, seam quality and protection details need to work together.
The liner type, thickness, exposure and containment requirements are project-specific. We assess the installation requirement against the material specification, drawings, site access and testing plan.

Review subgrade preparation, access, protection layers and deployment conditions.
Coordinate panel layout, anchoring, transitions and material handling.
Agree seam welding and inspection methods appropriate to the specified liner.
Define the required seam records, repair logs and acceptance documentation.
Liner specification and drawings; area and panel layout if available; subgrade condition; site access; testing requirements; schedule.
Scope, material requirements, preparation, testing, protection, access and any warranty are agreed in the written proposal.